Metal Floor Deck Roll Forming Machine Steel Decking Sheet Making Machinery
Trapezoidal steel decking single wave rolling forming machine for Jordan is designed for one Jordan customer which can be used for making trapezoidal steel decking single wave in batch fully automatically. MD225 decking is the most advance trapezoidal steel decking product on the market and is a direct alternative to precast concrete planks, delivering unpropped span capabilities of up to 6.0m It is a long spanning metal decking panel installed on the top flange of the steelwork. It also can be designed compositely to two waves types and by lowering down the wave height.
Common Profiles
Specification
Main motor power |
7.5kw+7.5kw |
Roller material |
GCr15 & 45# steel |
Roller shaft material |
45# steel with quenched treatment |
Work speed |
15-20 m/min |
Dimesion |
11600*1500*1200mm |
Structure |
Middle plate welded frame structure |
Main frame |
500 H steel welded |
Drive mode |
Chains drive |
Control system |
PLC control system |
Hydraulic station |
5.5 kw with cooling fan |
Cutting type |
Hydraulic cutting |
Cutter material |
GCr12 chromed and quenched for good hardness and using |
Working flow
1.Hydraulic Decoiler
usage: to support the coil and make the uncoiling
capacity: 5 tons
inner diameter: 450-550mm
coil width: 1250mm
2.Main roll forming machine
Feeding device: With two hand wheels to adjust the feeding of the material,with bearing inside of the feeding rollers.
Machine frame: 500H steel welded
Machine structure: middle plate
Roller station: 32 stations
Roller material: 45# steel withquenched treatment and hard chroming
Shaft diameter: 80mm,solid
Shaft material: 45# steel with tempering treatment
Motor power:7.5kw +7.5kw
Speed: 15-20m/min
Transmission: By chains
Voltage: 380V,50HZ,3Phase
3.PLC control station
PLC brand: Delta from Taiwan
Frequency converter brand: Delta from Taiwan
Encode: Omron
Function: Automatic control the length,quantity and batch
4.Hydraulic cutting system
Blade material: Cr12 Mov,with quenched treatment
Motor power: 5.5 kw
Cutting tolerance: +/-1 mm
Cooling system: with cooling fan
Cutting type: Hydraulic cutting
Feature: Low noise and high performance
5.Products receiving table
Type: Manual (Auto stacker is also available)
Length: 3m, 6m, 9m
Real words from customers:
FAQ:
Q1. Can you manufacture the roll forming machine according to my profile drawing or picture of finished product ?
A: Yes. Our rich experienced technical team can draft the accurate profile drawing, provide the most suitable technical solution for your required roll forming machine.
Q2. How can we be assured that you will deliver us quality machine with spare parts ?
A: 1. Customers can come to our factory, or send the technical people to our factory for checking the quality.
2. We can send the technicians to the buyer's factory for the installation of the machine.
Q3. What's your payment terms and delivery time?
A: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable. After we get down payment, we will arrange production. About 45 workdays for delivery.
Q4. Do you have after-sales support?
A: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q5. Do you sell only standard machines?
A: No, most of our machines are customized according to customers specifications, also adopt top brand components.
Q6. What will you do if the machine is broken?
A: We provide 1 year free warranty and free technical support for the whole life of any machine. If the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the roll forming machine.
Q7. Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q8. How to visit your company?
A:1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2)Fly to Tianjin airport, By high speed train From Tianjin to Cangzhou Xi (0.5 hour).
3) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.