After-sales Service: | Available |
---|---|
Warranty: | Available |
Tile Type: | Colored Steel |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
C Z Purlin Rolling Machine
Production Working Flow
Manual decoiler →7-roller leveling→ feeding→ puncher unit→ pre-cutting die→ roll forming machine→output table
The Main Purpose and Characteristics
in truth, This Fully automatic purlin making machine uses the same set of equipment to produce all the specifications in the C and Z Galvanised Steel Purlins plate type drawing, and the C specification conversion is completely automatic, and the operation is convenient and fast. Specifically, The structural design of the coaxial sliding sleeve eliminates the old cantilever unilateral forming unit and solves the problems of the insufficient structural strength and speed difference, and deviation.moreover, The control system is completed by an industrial PLC and auxiliary electrical components, and a human-computer interaction interface. the production efficiency is high, the specification adjustment can be completed in a few seconds, and the control system automatically adjusts as long as the parameters are input on the display screen.
The cutting mold frame adopts the gantry type and is made into a whole. According to the length parameter of the input workpiece, after using the encoder to lengthen.
After the encoder is fixed in length, it will automatically stop and cut off.
(1) Cut mode: This machine adopts the front cut mode.
(2) The hydraulic shear type is adopted, and the workpiece is effectively cut to a width of 600 mm. Shear thickness: 1.5 mm.
(3) Scissors material: Cr12,and quenched. The quenching hardness is reached (HRC 58-62 degrees).
(4) Install the material guide plate and the discharge plate before and after the shearing, structure to ensure smooth material in and out.
Productivity: 5-15m/min
Productivity: 5-15m/min
Supply Ability: 45 working days
Length: 5-12m
Certificate: CEISO9001
Suppliers with verified business licenses